A foundation spreads the building's load onto ground that can carry it, at a depth frost and shrinking clay cannot reach. The strip foundation, a continuous concrete trench under walls, is the default where good ground sits at a sensible depth. Pad foundations carry point loads from columns and posts. A raft is a slab that floats the whole building on weak surface ground, spreading load over the full footprint. Piles and piers bypass bad ground entirely, reaching down to firm strata and carrying the building on stilts of concrete or steel. The types are not rivals in a catalogue; each is the answer to a particular ground, and the ground, investigated honestly, chooses among them. Ask the ground politely, with trial holes, before it answers rudely, with cracks.
Soil decides, and soil hides. Trial pits or boreholes reveal what the surface conceals: made ground, old fill, groundwater, tree roots and the shrinkable clays that swell and crack with the seasons. Near trees on clay, foundations deepen dramatically or turn to piles, because roots dry the ground in summer and the building rides the seasons. Old industrial land adds contamination to the questions. Neighbours' extensions, drains and wells all vote too. The investigation is the cheapest part of any foundation and the most skipped; a few hundred spent on holes and a soil report routinely saves thousands in over designed concrete or, worse, under designed optimism. Engineers earn their fee at exactly this moment.
Traditional strips run at least 450 millimetres wide for a two storey wall and deepen to a metre or more in ordinary ground, deeper in clay near trees, always below frost and topsoil. Width spreads load; depth escapes movement; concrete thickness resists the bending the ground imposes. Mass concrete strips, reinforced strips and trench blocks each have their country and their following. None of these habits replaces the design: loads, soil bearing and local rules set the final sizes, and building control or an inspector signs them off in stages, usually at excavation and again before the pour. Photograph every stage with a tape in frame. The foundation is the one part of the building nobody will ever see again, and its paperwork is its only portrait. Every later trade stands, quite literally, on the choices made during this buried week.
The free calculator that goes with this guide:
Open the concrete volume calculator