How to Calculate Concrete Volume for Any Pour

Start with the shape, not the numbers

Every pour is one of a handful of shapes, and each has its own volume rule. A slab, footing or floor is a flat box: length times width times thickness. A rectangular column is the same box stood upright, using its height instead of a thickness. A round column or post hole is a cylinder: pi times the radius squared times the height. Solid steps catch people out most often, because each step carries the weight of the ones above it; the volume is the width times the tread times the riser, multiplied by the step count times one more than the step count, all divided by two. Irregular areas can be split into rectangles and triangles and added together. Once you name the shape honestly and sketch it with its sizes, the arithmetic is the easy part.

Work in one unit, all the way through

Most wrong orders start as unit muddles: metres for the length, millimetres for the thickness, and inches somewhere in a notebook margin. Convert everything to metres before you multiply and the answer lands in cubic metres, the unit ready mix is sold by. A thickness of 150 millimetres is 0.15 metres; a 4 inch slab is close to 0.1 metres; a 6 yard run is 5.49 metres. If your supplier works in cubic yards, finish the metric sum first and multiply by 1.308 at the end. Keep the raw figure before wastage somewhere in your notes, because the wastage conversation with the supplier goes better when both numbers are on the page, and because a later pour on the same job can reuse the clean figure.

Add wastage like a professional

The drawing volume is never the ordered volume. Ground is never perfectly level, formwork bulges a little under pressure, the pump keeps a prime load in its lines, and the last barrow always spills on the way. Five percent covers a tidy slab on prepared, level ground; ten percent is honest for footings in dug trenches, for steps, and for ground you have not seen levelled. On a 3 cubic metre pour, ten percent is a third of a cubic metre, roughly the difference between finishing the job in one visit and paying for a short load at penalty rates with a crew standing idle. Order the wastage in. If a little stays in the truck, you have lost a small sum. Run short, and you have lost the day and gained a cold joint in the slab.

Put it into numbers

The free calculator that goes with this guide:

Open the concrete volume calculator