All guides

Laminate and Wood Flooring: A Laying Guide

The subfloor is the floor's foundation

Laminate and engineered boards float: they rest on the subfloor as one joined sheet, held by gravity and skirting. That makes the subfloor the real floor. It must be flat within about 3 millimetres over 2 metres, dry, and clean; high spots telegraph through as bounce and clicking, and hollows open joints in a season. Grind or plane the highs, fill the lows with levelling compound, and check moisture on concrete with a meter or the plastic sheet test before a board is opened. On timber, screw down every squeak and loose board now, because after the laminate lands, the squeak is a permanent resident with a rent free lease.

Underlay, acclimatisation and the gap

Underlay is chosen for the job beneath it: foam for simple cushioning, fibreboard for levelling and sound, combined damp proof membrane underlay where a concrete slab needs vapour control. Boards acclimatise in the room, in their packs, for at least 48 hours, because timber based cores move with the house's humidity and a floor laid tight from a cold van will peak or gap as it settles. The expansion gap, typically 10 to 12 millimetres at every wall and fixed object, is not sloppiness; it is the floor's breathing space, hidden by skirting or beading. Measure the packs from the calculator's count, add your wastage for the pattern of cuts, and open one pack to check colour variation before the floor is committed.

Laying pattern, staggering and thresholds

Start on the longest straight wall, work left to right, and stagger end joints by at least a third of a board or the maker's stated minimum, using the offcut from each row to start the next when length allows. That stagger is both structure and appearance: lined up joints make a zipper that catches every eye and concentrates weakness. Keep the rows straight with spacers at the gap, check every third row against a line, and undercut door architraves so boards slide beneath for a finish no beading can match. At doorways between rooms, fit a threshold bar over a proper expansion break, because a floor that runs unbroken through a whole house will find the one doorway where it needs to grow, and it will grow upward. Save the pack labels and one spare board with the house documents, and a damaged board in ten years becomes an evening repair instead of a refloor.

Put it into numbers

The free calculator that goes with this guide:

Open the flooring calculator