Soil behind a wall is not a passive neighbour; it presses sideways with a force that grows with depth, and waterlogged soil presses like a fluid while swelling the load beyond dry calculations. A retaining wall resists by weight, by geometry, by reinforcement into the bank, or by anchors, and it fails by sliding, overturning, bearing failure or simple rot and rust, usually announced in advance by a lean, a bulge or cracks that widen by the season. The taller the retained height, the faster the forces grow, which is why garden walls of half a metre are carpentry and walls of a metre and a half are engineering. Rules in many places draw exactly that line: beyond modest heights, a design is required, not advised.
More retaining walls are killed by water than by earth. Rain enters the retained ground, the pressure doubles, the fines wash toward the wall, and the face that stood for five dry years leans in one wet winter. The defence is a drainage system with the same status as the wall itself: a perforated pipe at the heel in clean gravel, wrapped or graded so it cannot silt, led to a real outfall; a drainage layer or drainage composite against the back of the wall; weep holes through the face where the design uses them; and the surface above graded so water is invited away rather than in. Coping sheds the top. None of this shows in the photograph of the finished wall, and all of it decides whether there is a wall to photograph in year ten.
Gravity walls of mass concrete, stone or stacked block hold low heights by sheer weight, widening toward the base. Gabions, wire baskets of stone, forgive movement, drain freely and suit banks and streams. Timber sleepers and crib walls serve gardens at modest heights with a finite life honestly admitted. Reinforced masonry and reinforced concrete cantilever walls are the engineered answer as heights grow, their footings reaching back under the retained soil so the earth itself becomes part of the resistance. Whatever the type, the footing sits below frost on firm ground, the backfill is placed in layers with free draining material against the wall, and heavy compaction plant keeps its distance from the fresh work. Build the drain first, the wall second, and the photograph last.